Модернизация
The erection of a hinged arch structure above the zone of the railway freight front of the terminal
Goal
Benefits
Goal
The extension of the reception and departure routes No2 and No3 to a useful length of at least 1050 lm.
Installation in the even neck of devices for charging and testing the brakes (RCD).
Installation in the odd throat of technical devices that provide fastening of wagons.
Installation of an automated system of commercial inspection of wagons.
Benefits
Exclusion of waiting time for re-delivery of wagons to the unloading sites.
Exclusion of the time of employment of unloading places by the repair of wagons.
Elimination of waiting time and acceptance operations at unloading sites.
Generation of faulty cars, and delivery to the station is suitable.